- boiler,steam boiler,biomass boiler,waste heat boiler,thermal oil boiler - Green Tech Energy Industrial Co., ltd
- boiler,steam boiler,biomass boiler,waste heat boiler,thermal oil boiler - Green Tech Energy Industrial Co., ltd
- boiler,steam boiler,biomass boiler,waste heat boiler,thermal oil boiler - Green Tech Energy Industrial Co., ltd page 2
- boiler,steam boiler,biomass boiler,waste heat boiler,thermal oil boiler - Green Tech Energy Industrial Co., ltd
- boiler,steam boiler,biomass boiler,waste heat boiler,thermal oil boiler - {cat}
- boiler,steam boiler,biomass boiler,waste heat boiler,thermal oil boiler -{cat}
- boiler,steam boiler,biomass boiler,waste heat boiler,thermal oil boiler -{cat} page 2
- boiler,steam boiler,biomass boiler,waste heat boiler,thermal oil boiler -{cat} page 3
- boiler,steam boiler,biomass boiler,waste heat boiler,thermal oil boiler -{cat}
- boiler,steam boiler,biomass boiler,waste heat boiler,thermal oil boiler - Green Tech Energy Industrial Co., ltd
- page 2
- page 3
- 3 sets boiler loaded in container this morning
- 3 sets boiler are loaded today
- 1 set WHRB delivered to a new client
- 3 sets WHRB has been loaded this morning
- a new EGB loaded and passed PSI by SGS today
- 1 set WHRB delivered from Qingdao port
- 1 set WHRB delivered from Lianyungang port
- about us
- Overcome the interference of COVID-19 epidemic situation, we finally deliver 5 set WHRB, 200t seamless pipe and other accessories for 3 different customers in Lianyungang port. Thanks for everyone's hard work!
- 2 sets WHRB have been passed inspection by SGS, and delivered to Tianjin port.
- 2 sets WHRB has passed SGS inspection and loaded in Tianjin port, thanks for everyone!
- A 4t/h WHRB is delivered to Tianjin port today, it will be delivered by bulk ship.
- welding station
- welding station
- pipe bending
- CNC cutting machine
- Annealing
- Membrane wall line
- membrane wall
- rolling machine
- rolling machine
- tube plate welding machine
- Tube sheet weld
- Fin Tube Welding Line
- about us
- about us
- about us
- about us
- Fin Tube
- production1
- production
- A 2t/h WHRB passed PSI by SGS and has been loaded in container.
- A 5t/h waste heat recovery boiler passed SGS inspection and ready to delivery.
- A 2t/h WHRB passed PSI by SGS and has been loaded in container.
- Fully Continuous Waste Tire Pyrolysis Plant
- Biomass pellet fired boiler (commercial use)
- Coal Water Slurry Boiler
- Pulverized coal boiler
- Oil/gas fired thermal fluid boiler
- Oil/gas fired hot water boiler
- Oil/gas fired steam boiler
- Coal/biomass fired thermal fluid boiler
- Coal fired hot water boiler
- Coal fired steam boiler
- Circulating Fluid Bed Boiler-CFB boiler
- Gas Oil Fired Thermal Fluid Boiler
- Coal/biomass fired thermal fluid boiler
- Solid waste incineration boiler
- Biomass Fired Thermal Fluid Boiler
- Biomass hot water boiler
- Biomass steam boiler
- Waste Heat Recovery Boiler